There’s some talk of trying to get the footings for the new walls laid BEFORE the weekend. If you can’t make Sunday, but can make Friday this might be the time for you!
I’m happy to come and do some work Friday Night this week, but would need a couple of others to join in to make it worthwhile. Bonus points if you understand concrete and how that would be made / mixed / poured.
I have also mooted the possibility of doing some work on Thursday evening on a couple of other threads as well. If there is interest, we can divide the work between the two days (maybe one side one evening, and the other side the next).
Ok, great, if some work gets done thursday, that splits the load -infact, if the L shaped bit is cast thursday, we could remove the shuttering and use that to start building the final form on Friday.
By far. The lining has to go in before we can build the timber walls anyway.
(The lining itself has a very short lead time btw. so we can start on that as soon as we decide it’s sensible)
Might be worth getting the materials in for that as soon as the footings are done, then if there’s enough people on site, we could form team blockwork, and team lining?
at very least we could get the battoning done, whilst blocks are going down (/up?). Probably relatively soon we should brave the tower and clear out the old electrical stuff in Ph2 as well. Another job for Sunday.